Contact Us
The main menu in the site starts here.
The text starts here.
Earth-Retaining Material
Hirose Mega Beam
BG Construction Method (Multifunctional Large-Diameter Drilling Method)
SMW Construction Method (Work for Soil Cement Continuous Wall)
EcoMW method
Special pile driving work (Gravel layer / rock bed / existing obstacle removal)
Full-Slewing All Casing Construction Method (CD Method)
Silent Piler Method (Hydraulic Press-Fitting and Extraction Method)